From sample to 5,000 units per style — full-package manufacturing with supply-chain integration. Denmark HQ, production in Bangladesh and China, shipping to UK, USA and Europe.
Wovens, jersey, T-shirts, dresses, blouses, shirts.
From 50 pieces
Fully fashioned, flat knit, jacquard, intarsia.
From 50 pieces
Single-jersey, interlock, French terry, fleece.
From 50 pieces
Twill, poplin, oxford, denim, gabardine.
From 50 pieces
Vintage washes, premium constructions, raw selvedge.
From 50 pieces
Bags, hats, scarves, soft leathergoods.
From 50 pieces
Week 1
Confirm specs, fabrics, trims.
Weeks 2–4
Proto + revisions.
Week 4
PPS sign-off.
Weeks 5–10
Cut, sew, finish.
Weeks 11–12
Inspect, pack, ship DDP.
Indicative FOB ranges below. Actual quotes depend on fabric, finishes, quantities, and trim choices.
Cotton, jersey, basic finishes
French terry, fleece, mid-tier finishes
Performance fabrics, technical detailing
5–10 day transit · DDP available
10–14 day transit · East/West coast ports
4–8 day transit · Intra-EU duty-paid
| UK-only mfg | Offshore-direct | Fabrickly | |
|---|---|---|---|
| MOQ | 100–500 units | 300–1000 units | 50 pieces |
| FOB price | Premium | Lowest | Mid-tier |
| Lead time | 8–14 weeks | 16–24 weeks | 8–12 weeks |
| Communication | Same timezone | Slow async | EU hours, English-fluent PMs |
| Compliance | Self-declared | Variable | Sedex/BSCI/WRAP/OEKO-TEX/GOTS |
| Project management | Senior | Limited | Dedicated PM per account |
50 pieces per style. We can mix sizes and colorways within that 50. Smaller MOQs are available for sampling and proto.
8–12 weeks from approved sample to bulk delivery. Rush options available for confirmed buyers.
Bangladesh and China facilities. Both are Sedex/BSCI audited. Specialty technical work routes to China; volume cut-and-sew typically routes to Bangladesh.
30% deposit on PO, 70% on shipment. Established clients can negotiate Net 30. We accept TT, LC, and Wise for international transfers.
Yes — Sedex, BSCI, WRAP, OEKO-TEX, GOTS. Audit reports are available on request and meet retailer procurement standards (M&S, Selfridges, ASOS).
Yes. Send us your pack, we'll review it and either quote against it or flag issues for revision before bulk.
Send a brief, get a real quote in 24 hours.
Our standard MOQ is 50 pieces per style. Some technical pieces (denim, knitwear) start at 100. No quarterly volume commitments required.
Our primary cut-and-sew facility is in Dhaka, Bangladesh. Specialty knitwear and performance apparel runs through our Shanghai partner facility. Both are Sedex SMETA and BSCI audited.
Standard production lead time is 6 weeks from approved sample. This includes fabric sourcing, cutting, sewing, finishing, QC, and labeling.
Yes. Without a tech pack we cannot guarantee quality or consistency. If you don't have one we can produce a Fabrickly tech pack first (7 days, from £349).
Standard terms are 50% deposit on order confirmation, 50% on inspection-passed goods before shipping. Net-30 available for repeat clients with established history.